Why wasn’t it known back in 2016 that a larger Public Safety building was needed?

The 2016 referendum was based on an old study of the building. Following approval of the referendum, the City conducted a space needs analysis in 2017. It determined the future needs of the City and the required square footage of the proposed police station. Thus, the City’s space needs study for the Police Department had yet to be completed at the time of the 2016 Bond Referendum. 

Show All Answers

1. What is a bond referendum?
2. What can general obligation bonds be used for?
3. If the Referendum passes, will my taxes go up?
4. What will the Public Safety G.O. Bond cost residents?
5. When will the Election Take Place?
6. What General Obligation Bond question will we be voting for on November 7, 2023?
7. What is included in the $46.9 Million?
8. Why does the question mention $11,400,000 that was previously approved in 2016?
9. Why was the 20,000-square-foot building not constructed?
10. Why wasn’t it known back in 2016 that a larger Public Safety building was needed?
11. Is the Police Station going to move to the Oviedo Mall?